top of page

Final Report

Summary Paragraph

This final report concludes a year long analysis of National Museum of the United States Army. The report includes an analysis of the buildings current mechanical design and offers alternatives to the proposed design. Additionally, the report dives into two breadths, electrical and construction to further understand the consequences of the proposed alternative designs. Again I would like to thank all those who helped in making this project possible.

Executive

Summary

Final Report

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Nicholas Bast. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

I would like to thank and give credit to the Army Historical Foundation and SOM for the beautiful renderings of the National Museum of the United States Army.

bottom of page